Home

Air Tools

Hydraulic Tools

Electric Tools

Gasoline Tools

Air Compressors

Water Pumps

Tool Accessories
Points and Chisels
Rock Bits*
Drill Rods*
Dexpan®

Extension Cords*
*Call for Info

Diamond Products

Hose Products

Generators

Floor Prep. Tools

Safety Products
Caution Tape
Ear Protection
Dust Masks
Eye Protection
Anti-Vibration Gloves
Drivers Gloves

Parts Department
Info in the works!
Call for pricing and availability.

Specials!

Contact Information

 
Non-Explosive Demolition Agent
   

Dexpan® Non-Explosive Controlled Demolition Agent
For controlled demolition, reinforced concrete cutting, rock breaking, quarrying, mining, excavating.

Easy to use: Mix with water, pour into holes, let it expand.
Expansive Strength: 18,000 psi when mixed with water.
Cracks reinforced concrete, limestone, flagstone, granite, marble, onyx.
Safe and quiet. Provides silent cracking.
No noise, vibration, or dust.
Efficient and cost effective.



Product Description
1. Amazing 18,000 lb/inch3 (500 kg/cm3) expansive strength when mixed with common water.
2. Easy to use, just mix with water, pour into holes, then Dexpan expands.
3. Cracks reinforced concrete, limestone, marble and granite safely and quietly.
4. Works without noise, vibration, dust by providing silent expansive cracking.
5. No special permits, training or equipment needed. 

1. Drilling Holes should be drilled no further than 1 ft (30 cm) apart. Recommended hole diameter is 1.5 in (3.8 cm). Drill holes should be 80-90% of the depth, do not go through.

2. Mixing In a bucket, combine 0.4 gallons (1.5 liters) of water with one 11 lbs (5 kilograms) bag of DEXPAN. Mix well, using a drill and paddle is recommended.
3. Filling Clean holes before filling. DEXPAN slurry should be poured into holes within 10-15 minutes after mixing, only fill the holes about 1/2 to 1 inch (2.5 cm) from the top. Agitating the DEXPAN in the hole to make sure no air is trapped in holes. A grouting pump might be required to fill horizontal holes. Caps might be needed for horizontal holes.
4. Coverage: Normally one 44 lb (20 kg) box of DEXPAN can fill up to 35 lineal feet (10 meters) of 1.5 inches (3.8 cm) diameter holes. Might not have to fill up every hole depending on application.
5. Cracking Or Cutting Time Properly mixed, the cracks may appear after 2 hours of filling drilled holes, depending on ambient temperature, humidity, rock or concrete hardness.
6. Cautions: A pair of safety glasses, rubber gloves and a dust-proof mask is required. After filling DO NOT look directly into the holes as to avoid any accident to be caused by blow-out. Keep DEXPAN in DRY storage.
 
Select the correct type of DEXPAN for your temperature range.

3 Types of Dexpan® usable at the following temperatures:
Dexpan I: 77-104 degrees F° or 25-40 C°   
Dexpan II: 50-77 degrees F° or  10-25 C°   
Dexpan III: 23-50 degrees F° or 5-10 C°


Call 1-800-241-9669 for more info and/or place your order.

 

 


©2008 MATW, Inc.